Mobile Navigation

Fall Savings | LEAF500 Save $25 orders $500+  |  LEAF1000 Save $50 orders $1000+

Powering a House of Worship Stage

By Kerry Lombard, Gaffer, 35 years of lighting and electrical experience · Updated 11/19/2026

Short answer: Add up the watts on your stage, convert them to amps, and keep each circuit under 80% of its breaker rating. Put lighting and audio on separate circuits, plan power and data to every fixture position, and have permanent wiring done by a licensed electrician. LED fixtures make all of this easier because they draw a fraction of the power of older lights.

Step 1: Add up your load

Every fixture lists its wattage. Add them up for each circuit and divide by your voltage (120V in most US churches) to get amps.

FixtureTypical drawAmps at 120V
575W tungsten ellipsoidal (such as a Source Four)575Wabout 4.8 A
1,000W (1K) tungsten fresnel1,000Wabout 8.3 A
LED wash or profile fixtureCheck the spec; often 100–300Wabout 0.8–2.5 A

Step 2: Follow the 80% rule

A circuit that runs for hours at a time should carry no more than 80% of its breaker rating: about 16 amps on a 20-amp circuit, or 12 amps on a 15-amp circuit. On one 20-amp circuit that's three 575W ellipsoidals (about 14.4 A) or ten 150W LED fixtures (12.5 A).

Step 3: Keep audio and lighting apart

Put sound, video and lighting on separate circuits. Dimmers and LED power supplies can put electrical noise on a line, and shared circuits are a common cause of hum and buzz in a sound system. Ask your electrician to give audio its own dedicated circuits.

Step 4: Dimmed power or constant power?

Older tungsten fixtures are dimmed by a dimmer rack or dimmer packs. LED fixtures need constant, undimmed power and are dimmed by a DMX control signal instead. Running an LED fixture through a dimmer can make it flicker or damage it. If you're mixing old and new fixtures, you need both: dimmed circuits for tungsten, and constant-power circuits (or the non-dim setting on a modern dimmer rack) for LEDs.

Step 5: Plan power and data together

Every fixture position needs power and a DMX or network data run back to the console. Planning both at once saves pulling cable twice. For portable stages, youth rooms and special events, portable distribution, from a simple quad box to a breaker-protected distro box sized to the feed you have, puts outlets where you need them.

Step 6: Leave permanent wiring to a licensed electrician

New circuits, panels, tie-ins and anything inside a wall must follow local electrical code and be done by a licensed electrician. We can help you work out what to ask for, so the electrician's work matches the lighting you're buying.

Quick checklist

  • List every fixture and its wattage.
  • Group fixtures into circuits under 80% load.
  • Keep audio, video and lighting on separate circuits.
  • Decide which circuits are dimmed and which are constant power.
  • Plan DMX or network data to every position.
  • Have permanent electrical work quoted by a licensed electrician.

Need help? Try our Set Power Calculator, see our church lighting and power distribution pages, or call 888-276-3667.